Execution works of the electrical network system project for medium voltage (11 kv) and low voltage (0.4 kv) for five villages in Erbil governorate with a length of (45 km) with the installation of transformers and their required bases.
Execution works of medium voltage network project (11 – 33KVA) with all the modifications required to transferring the electrical power to the Rzgary intersection project in eight stages at a total cost ($2,000,000) .
Execution works of the medium voltage electrical network system project (11kv) for the village Goma Shin, with a length of (12km), with the installation of transformers and their required bases.
Execution works of the medium voltage electrical network system project (11kv) and low voltage for a residential complex (Aynda 1 -2) , with the installation of transformers and their required bases and internal connections to the project.
Execution works of the medium voltage electrical network system project (11kv) and low voltage for a (hewlery nwe 1 -2),with the installation of transformers and their required base sand internal connections to the project.
Worked in smart meter project in 2019, in Erbil, we were the first company that installed the first smart meter box in the south industry area.
Execution works for petrol company in Qayara, installation of71 poles with three transformers.
Transferring six mobile substations in 2021, in twelve different areas within the borders of Erbil Governorate. – Transferring nishtiman mobile station to dara shakran. Transferring koya mobile station to makhmur . – Transferring karezan mobile station to timar industrial area.. Transferring hawkery mobile station to taq taq . – Transferring nwsaran mobile station to makhmwr-bazarga .. Transferring shaqlawa mobile station to soran .